
- Goldsmiths
- Birmingham Bullring
- 90 linear metres @ 9m high fire rated hoarding

- Oxford Street London
- Bespoke external hoarding
- 65 meter hoarding x 6m high installed in 1 shift!
- Temporary works design

- 1 hour fire rated hoarding
- Vinyls installed in same evening
- 3 day lead time from order, manufacture, print & installation
- 3.5m high

- 1 hour fire rated hoarding
- Vinyls installed in same evening
- 3 day lead time from order, manufacture, print & installation
- 3.5m high

- 1 hour fire rated hoarding
- Vinyls installed in same evening
- 3 day lead time from order, manufacture, print & installation
- 3.5m high

- 1 hour fire rated hoarding
- Vinyls installed in same evening
- 3 day lead time from order, manufacture, print & installation
- 3.5m high

- 1 hour fire rated hoarding
- 1 night hoarding installation
- 1 night vinyl installation
- 8m high

- 8m high
- Wind load calculations required for external capabilities
- Statement graphics
- 1 night installation

- H&M major refurbishment – Birmingham bullring
- 1 hour fire rated hoarding
- 9m high
- Modular system to enableshop front works

- Goldsmiths/ Rolex new look
- Intu Watford
- 6m high 60 minute fire rated hoarding
- 2.5 hour installation, 2 hour graphic installation

- Oxford Street London
- Bespoke external hoarding
- 65 meter hoarding x 6m high installed in 1 shift!
- Temporary works design
Scroll to top